用“CTCS”造句大全,CTCS造句
Modeling and Realizing of On-Board Equipment of CTCS-2 Train Operation Control System with UML;
Schema of Point with Large Number Keeping the Continuity of Bending Track Information in CTCS Level 2
Research on the Automatic Testing Methodology of CTCS-3 Onboard Equipment
With speeding up the construction of the passenger dedicated line with CTCS-3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle.
The Application of 3D Scene Simulation Technology in the CTCS Level 3 Simulation System;
随着CTCS - 3级客运专线工程建设的加快,针对单个rbc的控制能力与RBC的设置原则进行研究很有必要。
Research on CTCS-3 Board-Ground Communication Protocol Conformance Testing Based on TTCN-3