造句

当前位置 /首页/造句 > /列表

用“PHC”造句大全,PHC造句

9、Experimental Study on Increasing Load-Bearing Capacity of Single PHC Pile by Post Grouting Process

12、Thick-walled Steel Pipe Piles in Lieu of PHC Pipe Pile Technical and Engineering Applications

15、结论多项肿瘤标志物联合检测对PHC尤其是AFP**PHC的诊断具有重要价值。

18、AFU与AFP联合检测,可使PHC的诊断阳*率提高到。

21、This article discusses some issues unsolved about lightning protection grounding device of PHC piles and provides some correction Suggestions based on the construction experience.

24、采用热轧卷取法生产PHC管桩端板,质量符合要求,材料利用率高节能降耗生产效率高

27、对于桩端持力层较好,而上覆软弱土层较厚的大直径PHC桩,尚应考虑上部土层侧摩阻力软化现象的影响;

30、在开学第一天,即9月8日星期三,新生将在上午8:45由宿舍管理员陪同来到学校大礼堂-PETERHUMPHREYS’中心(PHC),参加9:00的全校大会。接着新生被各自辅导老师带到所在班级。

3、The Test Anaysis of PHC Pipe Pile Vertical Bearing Capacity

6、Study on non-steam autoclaved PHC admixture in the concrete

10、The Application of Large Diameter PHC Spun Piles in Southern China

14、成份:珍珠粉、PHC保湿成份、胶原蛋白、海藻精华等。

19、Objective To investigate the effect of long chain fatty acid-CoA ligase 4 (FACL4) in the pathogenesis of primary hepatic carcinoma (PHC).

23、Objective To explore the therapeutic effect of dual perfusion embolization and chemotherapy via hepatic artery and portal vein( combmation treatment) in the treatment of unresectable PHC.

28、汽轮机主厂房的基础承台共计,已完成,汽轮机基座底板浇筑完成,汽轮机基座底板正在进行绑筋,锅炉间PHC管桩施工已完成,土方开方完毕。

PHC造句

2、Engineering Practice and Quality Control Cruces of PHC Pipe Pile

7、Aim: The relations among PHC patients' ABO blood type, HBV infection and family history of PHC were studied.

13、AFU与AFP联合检测可使PHC诊断阳*率提高到。

20、目的探讨原发*肝癌(PHC)自发破裂出血的诊治特点及预后。

26、目的探讨脂肪*辅酶A连接酶长链4(FACL4)在原发*肝癌(PHC)发生中的作用。

4、Broken Reason of PHC Pile and Its Countermeasure of Construction

11、Research on Excess Pore Water Pressure Which is Induced by Jacking of PHC Pile;

22、为国内生产PHC管桩端板开创了一种新的工艺路线。

1、Assistant Programme Officer - PHC

16、STUDY OF TIME EFFECT ON THE BEARING CAPACITY OF JACKED-IN PHC PIPE PILE IN COHESIVE SOIL AREA

29、On the first day of term,Wednesday,08 September,new pupils will be escorted by their Houseparents to the Peter Humphreys' Centre (PHC)-our main School Hall-at 8.45 time for the School Assembly at 9.00a.m. New pupils will then be escorted to their appropriate form bases by their Form Tutors.

17、Research and Application on Holding Type PHC Tube Pile with Tip Entering into Rock by Augering Technique;

8、PHC pipe pile application in hydraulic engineering and construction quality control

25、成份:珍珠粉、白肤因子CE、PHC保湿成份甘草精华、矿物温泉微量元素、丝肽、胶原蛋白、生物透明质*等;

5、Application of PHC piles in Complxe Geotechnical Ground Engineering

TAG标签:PHC 造句 #